featured Current projects


Regis Student Center.jpg

REGIS STUDENT CENTER RENOVATION AND ADDITION

Location: Denver, Colorado

Description: Update and improve the existing Student Center by completing a new main entryway addition on the east side of the building. In conjunction, there will be a new bookstore expansion/addition on the south side of the building and south parking lot 3 will be modified to accommodate the expansion. Internally, the food service area will be upgraded. The project includes new restrooms, elevator, and upgraded mechanical, electrical, and plumbing services. The upstairs will have a remodeled lounge, but the existing offices will remain.  1,785SF addition and 38,657SF remodel.

ARCHITECT: Soderstrom Architects

 
 Isabella Bird Community School                               Denver, Colorado                                                 Humphries Poli Architects, P.C .

DSST College VIEW Kitchen & cafeterria

Location: Denver, Colorado

Description: This project is a 1-story, 11,093SF kitchen/cafeteria new building and site upgrades, including a synthetic turf play area.  The project is located between drop off and existing campus buildings.  GTC built a walkway, temporary stairs and installed bilingual signs to direct students around  the construction site

ARCHITECT: MOA Architecture

 
LCC Building A - Render 1-Revised 2 - newsletter.jpg

LCC at ctc building a

Location: Louisville, Colorado

Description: New 13600SF office warehouse in the Colorado Tech Center. 

 

ARCHITECT: Intergroup Architects

 
Erie MOB redering - newsletter.jpg

boulder community hospital - erie medical office building

Location: Erie, Colorado

Description: The project involves core and shell construction of a 41,628 sf 2-story Medical Office Building. The building, designed by PEH Architects, will feature steel frame, with glass and brick façade, as well as precast concrete and sandstone details. The airy, light-filled interior will include a glass curtain clerestory, solar shades, and a sweeping, terrazzo staircase with precast treads and radius glass panels. Construction also encompasses full site development with new parking lot and utilities. The parking lot will also include a 2-car electric charging station, with utilities in place for another potential station in the future. Located at 101 Erie Parkway, adjacent to the Erie Community Library, the new facility will be leased out for medical offices and urgent care, including a maternity ward and mental health outpatient services. The project is scheduled to complete in December 2018. The building marks the first presence for BCH in Erie, and the 33rd time GTC and BCH have collaborated since 2004. This project also marks GTC’s 22nd collaboration with PEH Architects

                                                  ARCHITECT: PEH Architects

 
Adams CFR Station 11 Renderings.jpg

adams county fire station no. 11

Location: Denver, Colorado

Description: Construction of a new two-story, 31,000 SF fire station with a second story level mezzanine/mechanical room with supporting facilities, associated site work will include a concrete/asphalt drive and parking lot.  Facility includes an apparatus bay with 5 pull through bays, bunk rooms, offices, living spaces and classroom.  Site utilities consist of water, sanitary, electric, gas services and emergency generator.  Geothermal, landscaping and irrigation are a part of this project. 

ARCHITECT: Allred Architecture

 
drawing.jpg

Arvada police - delta station

Location: Arvada, Colorado

Description: The construction of an approximately 10,000 SF new police substation on a 1.5 acre site for the Arvada Police Department. The building consists of reinforced masonry walls, structural steel framing with light gauge metal framing at interior walls. This building will have a structurally supported slab-on-deck concrete floor and a drilled pier and grade beam foundation system. This project includes offices, a locker room, a break room, and an acoustically-lined room for interviews. Certain walls throughout the station are constructed with Level 3 ballistic assembly. Despite an original goal of LEED Silver, the project is now on-target to surpass and achieve LEED Gold with a possibility of targeting Platinum.

ARCHITECT: Barker Rinker Seacat Architecture

 
Eagle Point Rec Center Rendering.jpg

eAGLE POINT RECREATION CENTER

Location: Commerce City , Colorado

Description: Remodel of the existing 2-story 65,000 SF recreation center and approximately 9,000 SF addition.  The existing facility is to remaining full operation during construction and completed in phasing.

 

                                                                                                                           ARCHITECT: ESSENZA ARCHITECTURE

 
South Metro FS #32.jpg

SOUTH METRO FIRE STATION NO. 32

Location: Centennial, Colorado

Description: Demolition of the existing fire station and adjacent small office structure, construction of a new 21,524 SF fire station, including a 5,144 SF basement. 3 apparatus bays, living quarters, kitchen administration offices and community room.

     

                                                                                                                     ARCHITECT: OZ ARCHITECTURE

 
Capture.JPG

Candelas Point retail center 

Location: Arvada, Colorado

Description: 2 Retail strip centers that consists a total of 20,800 SF. Includes parking lots, private drive and utilities.  

                                                                                                                                   ARCHITECT: Galloway and Associates

 
KIPP Rendering.jpg

dps kipp sunshine academy addition

Location: Denver, Colorado

Description: This project consists of the construction of a new two story addition. The addition is approximately 26,000SF and is comprised of 16 classrooms and a middle school size gymnasium. The project scope also includes renovation to the existing building and site conditions to accommodate the new work. 
                           

ARCHITECT:  Cuningham Group