SERVICES   |   Making a Difference From Start to Finish

At Golden Triangle Construction, we put more than 30 years of experience to work on your project during the design, preconstruction and construction phases.  Our proven ability to manage costs, schedules and quality ensures that you end up with a product that meets all your expectations. 

Our Preconstruction Department is a team of dedicated, trained professionals who seek out creative solutions to solve today's building challenges. Your construction project team, which includes a principal of the firm, will manage your project from start to finish with the industry's best skills and processes.

  

Preconstruction Services

At GTC, we prefer to over-emphasize our preconstruction services. By performing cost estimating, value engineering and a constructability review up-front during the design process as a member of the Owner / Architect / Contractor team, GTC enables a problem-free design for the project, which results in lower Owner risk and delivers projects on time and within budget.

  

To ensure that final design and project costs are consistent with the Owner's objective, GTC’s preconstruction process involves team interaction (Owner / Architect / GTC) from conceptual planning, design development and working drawing preparation, through working drawing completion.

  

GTC’s preconstruction services include three primary elements:

        

Design Evaluation and Review

  • Existing-conditions review of project site
  • Proposed structural systems review
  • Cost and availability evaluation for alternative methods and systems
  • Constructability review of architectural design on a trade-by-trade basis

Estimating

  • Prepare preliminary cost estimates at initial stages of planning and schematic design
  • “Wish list” management that lets you know what can or can’t be included
  • Definitive budget estimates as construction documents develop
  • Guaranteed Maximum Price estimate preparation when plans and specs are sufficiently complete for subcontractor bidding and definitive estimating

Scheduling

  • Project Preconstruction/Master Schedule for the overall preconstruction process
  • Preliminary Critical Path Schedule as a tool to determine/verify project completion date
  • Procurement Schedule to identify long lead materials

 

Project Management

GTC’s primary function is the management of commercial construction projects from estimating to project completion. Each component of the entire construction process is crucial to the success of the whole. The construction phase of the project includes but is not limited to the following:

  • Establish on-site organization and lines of authority in order to carry out the overall plans of the project on a totally coordinated basis
  • Establish procedures for and implement coordination of the Owner, Architect, GTC and our subcontractors
  • Maintain a competent full-time field staff to provide field supervision and management in connection with the performance of self-performed work and the work of the various subcontractors
  • Work with each subcontractor to develop detailed operating schedules for their portion of the work and monitor, update and report on this schedule throughout the construction period
  • Maintain on a current basis, a record of all subcontracts, including shop drawings, samples, purchases, materials equipment, applicable handbooks, federal, commercial and technical standards, specifications and any other related documents and revisions that arise out of the contract for the construction work
  • Make recommendations to the Owner for changes in the work that may be desirable or necessary due to the field conditions, cost, quality or progress of the work
  • Maintain accurate, up-to-date cost accounting
  • Monitor the interpretation of construction documents


Scheduling

GTC schedules and monitors all of its projects with state-of-the-art scheduling software.  Our project schedules are also prepared with the input of knowledgeable and experienced construction professionals such as Superintendents, Project Managers and trade specialists. Once we prepare our schedules, we also utilize subcontractors to identify any potential issues with man power and long lead items so schedules are as accurate as possible. GTC’s scheduling system is designed to assist our on-site construction staff and update the Owner as well as the GTC Principal-in-Charge on the project.  Our scheduling system includes the following:

  • Preconstruction
  • Milestone summary schedules
  • Detail construction schedules
  • Short interval scheduling
  • On-site project status and review
  • Cash flow projections
  • Project updating and custom reporting
  • Coordination of schedules and budgets

 

Safety

GTC management is committed to providing a safe work place for all employees. Construction is recognized as one of the most hazardous industries requiring the employer’s every effort to provide and maintain a safe work place.

GTC Safety Goals

  • Training at all levels on hazard recognition and elimination
  • Adjust attitudes to meld productivity and safety in order to achieve a true safety culture
  • Establish responsibility and accountability
  • Eliminate injury and human suffering
  • Prevent accidents, thereby controlling losses from property and equipment damage, lost productivity and reputation
  • Investigate all accidents and incidents in order to prevent recurrence
  • Monitor subcontractor safety and assure compliance with good "safe practices"
  • Plan safety and productivity

 

Subcontractor Safety

GTC monitors subcontractor safety performance and safety meetings in the following areas:

  • Compliance with all applicable codes and safe practices
  • Conduct safety meetings with subcontractor supervisors on a monthly basis
  • Document enforcement of safety violations by issuing "Safety Violations"
  • Monitor subcontractor tool box safety meetings

 

Hazardous Material Management

GTC has a moral and legal commitment to protect the safety and health of its employees and those working on and around its construction sites. It is with this commitment in mind that GTC requires the acquisition of Material Safety Data Sheets for all materials brought to the site by vendors, subcontractors and/or our clients' suppliers.

 

Who We Are | Our Projects | Services | Green Building | Locations | Subcontractors | Careers | Awards | GTC News | Home | Link
Golden Triangle Construction
700 Weaver Park Road | Longmont, CO 80501 | ph: 303-772-4051 | fax: 303-776-6525 | email: info@gtc1.net
Golden Triangle Construction of Southern Colorado
4815 List Drive, Suite 107 | Colorado Springs, CO 80919 | ph: 719-314-0531 | fax: 719-314-0535

  Retail
Office
Financial
Pre K-12 Schools
Parks & Rec
Municipal
Fire and Police Stations
Higher Education
Our Medical Projects
Current Projects
  Principle Office-Longmont
GTC of Southern Colorado
  GTC Newsletter
Our New Projects
Charitable Giving
Press Releases