Golden Triangle Construction, Inc.
Who We Are Our Projects Services Green Building Locations Suncontractors Career Opportunities Awards GTC News
Left Column

 

BOULDER SPECIAL TRANSIT

 

 

SIze: 37,323 SF

Completion:  January 2011

Delivery:  Hard-bid

 

 

This new 37,323 square foot building contains administration and maintenance facilities for the non-profit agency that provides transportation services to seniors and people with disabilities residing in Boulder County.

The new building, designed by OZ Architecture, more than doubles the size of Special Transit’s previous facilities.  The building encompasses two terraces, the higher of which contains administration services, classroom and break areas, a scheduling and dispatch center, and staff offices.  The lower terrace houses vehicle maintenance and parking facilities for up to 100 buses.  This area also includes six bays with vehicle lifts and fluid-dispensing systems for bus maintenance, a drive-through wash bay and a fueling station.

The new Special Transit incorporates such “green building” features as:

Sustainable Site: Minimized heat-island effect by high SRI roofing, reduced light pollution, construction activity pollution prevention, porous paving, concrete paving, alternate transportation (bus service), low emitting and fuel-efficient vehicle parking, stormwater quality control

 

Water Efficiency: Reduced irrigation demand due to native seeding and xeriscaping, high-efficiency plumbing fixtures

 

Energy Efficiency: Building energy modeling employed to design for maximum efficiency, commissioning employed to maximize efficiency and performance of built systems, lighting control program aids system energy efficiency, natural lighting reduced fixtures / energy loads, high-efficiency photovoltaic panels planned to reduce electricity demand, non-CFC-containing refrigerants used

 

Materials & Resources: Construction waste recycling including diversion of 75% of waste from landfills, post-occupancy recycling program, recycled content materials, materials purchased regionally

 

Indoor Environmental Quality: Increased outside air and ventilation, construction IAQ management during construction and prior to occupancy, low-emitting finishes specified, operable windows allow increased fresh air/ventilation and controllability of personal comfort, occupancy sensors/switching designed for maximum personal controllability, interior light shelves, overhead clerestories allow maximum natural lighting, daylight and views

 

Who We Are | Our Projects | Services | Green Building | Locations | Subcontractors | Careers | Awards | GTC News | Home | Link
Golden Triangle Construction
700 Weaver Park Road | Longmont, CO 80501 | ph: 303-772-4051 | fax: 303-776-6525 | email: info@gtc1.net
Golden Triangle Construction of Southern Colorado
4815 List Drive, Suite 107 | Colorado Springs, CO 80919 | ph: 719-314-0531 | fax: 719-314-0535

  Retail
Office
Financial
Pre K-12 Schools
Parks & Rec
Municipal
Fire and Police Stations
Higher Education
Our Medical Projects
Current Projects
  Principle Office-Longmont
GTC of Southern Colorado
  GTC Newsletter
Our New Projects
Charitable Giving
Press Releases